project team
ru
MARK AURELII FITNESS CENTER
2008
ARCHITECTURE
MARK AURELIUS
Tver region, Western Dvina
2008-2009
area: 1120 m²
program: reconstruction of a non-residential building for a fitness center
The building of the annex of the residential building turns into a single form covered with a shell of colored profile in such a way that the overhangs of the gable roof pass into walls, preserving both the material, the rhythm of color and the modular system. Inside the building, special attention is paid to the entrance area, service area and cafe.
For better insolation of the building, a second light is arranged above the main staircase, and above the cafe area, as well as 12 attic windows.
An erker is created on the facade, completely glazed on the second floor, which expresses the idea of connection with nature and at the same time is the club's hallmark (the facade faces the main square of the city). The entrance zone of the 1st floor is painted in the style of graffiti in the spirit of sports panels of the 80s. The interior decoration is dominated by wood of different types of processing. The roof is kept by elegant 24-meter trusses.
MYSHETSKOYE
BATH HOUSE
next project
© 2018 project team «8 lines»
ABOUT US
PROJECT
CLIENTS
PERSONNEL
info@llllllll.ru